To achieve the required depth, the excavation extended through sand and gravel to a depth of 9 metres. Water was encountered at 4 metres below ground level, requiring specialist grouting between piles and pumping to control water and allow construction of the reinforced concrete basement box.

The swimming pool is fitted with a floor which can be raised to conceal it, allowing the room to be used for functions.